ο»Ώ
FREE STANDARD SHIPPING TO THE USLifetime warranty on every piece30-day returns
+1 8014477699 WhatsApp
MAPPLE GEMS

Education

What Happens Between Your Order and the Ring Arriving

Seven stages, and the two where a decision is genuinely irreversible.

Written by the Mapple Gems workshop, Surat Β· Updated 8 September 2026

Short answer

A custom ring goes through brief β†’ CAD β†’ wax or resin model β†’ casting β†’ setting β†’ finishing β†’ despatch. Everything is changeable up to casting and very little afterwards, so the CAD approval is the decision point β€” that is where profile height, shank thickness and prong placement are fixed. Bench time is typically a week or so; the rest of any quoted timeline is transit and, on international orders, customs.

β€œMade to order” is a phrase people accept without much sense of what happens inside it. Knowing the sequence matters for one practical reason: it tells you when to ask questions, because the window for changes closes earlier than most people expect.

The seven stages

Stage What happens Changeable?
1. Brief Specification agreed β€” stone, metal, dimensions, size Fully
2. CAD A 3D model built to those numbers, sent for approval Fully β€” this is the decision point
3. Model Printed in wax or castable resin Yes, but it means restarting
4. Casting Metal poured into the mould; the ring becomes physical No β€” geometry is now fixed
5. Setting Stones placed and secured by hand Stones can change; structure cannot
6. Finishing Filing, sanding, polishing, plating if required Finish only
7. Despatch Final check, documentation, insured shipping No

Stage 2 is the only stage that matters for you, and it is the one people rush. A CAD approval usually arrives as a top-down render, looks like the ring, and gets a β€œyes, lovely” within the hour. But approving that render fixes profile height, shank thickness, prong placement and the total width across the setting β€” and three of those four are invisible from above. After casting, none of them can be changed without remaking the piece. So the useful thing to do at stage 2 is slow down and ask for the side elevation and the numbers in millimetres. It costs a day. Discovering the height at delivery costs a remake.

What actually takes the time

People assume the bench work dominates. It rarely does.

  • CAD and approval: one to three days, plus however long you take to respond. This is the most common source of delay, and it is on the customer’s side.
  • Model and casting: a day or two.
  • Setting and finishing: the skilled work, and the majority of bench hours.
  • Total bench time: around a week for a typical piece.
  • Transit and customs: frequently longer than the making, on an international order.

This is why production time and transit time should always be quoted separately. A single figure at checkout is a transit estimate, and a made-to-order piece has to be built before it can ship.

The stages where things go wrong

  1. A vague brief. β€œSomething like this but a bit different” produces a CAD that is nearly right, which costs a revision cycle. Numbers β€” millimetres, karat, thickness β€” produce a CAD that is right.
  2. Approving a top-down render. Covered above, and the most consequential.
  3. The size. Given late, given in a converted system, or measured on a cold morning. Send inner diameter or circumference in millimetres, measured at the end of the day.
  4. Duties and delivery. Not knowing whether the price is landed, or letting a parcel be left without a signature. Both are settled with one question before despatch.

Why change requests get expensive late

A revision at CAD is a file edit. A change after casting is not a change at all β€” it is a new ring, because the geometry lives in the metal.

Some things remain possible afterwards: resizing within a range, swapping a stone before setting, altering the finish, adding engraving. What cannot change is profile height, gallery design, prong placement, shank thickness and the fundamental shape. Those are decided at stage 2 whether or not anyone discussed them.

What to ask at each stage

  • At brief: the full specification in writing β€” stone millimetres and material, metal karat, shank width and thickness, accent count and size, gram weight.
  • At CAD: the side elevation, the profile height in millimetres, and confirmation that every point and corner has a prong over it.
  • Before casting: confirmation of the finger size in millimetres and how many sizes the design can be resized.
  • Before despatch: whether the price is landed, whether it is signature required, and what is declared on the customs paperwork.
  • On arrival: check it against the written specification, and photograph it including inside the shank.

Frequently asked questions

What are the stages of making a custom ring?

Brief, CAD, wax or resin model, casting, setting, finishing, despatch. Everything is changeable up to casting and very little afterwards, so CAD approval is the real decision point β€” it fixes profile height, shank thickness, prong placement and total width across the setting.

At what point can I no longer change a custom ring?

Casting. After that the geometry lives in the metal, so profile height, gallery design, prong placement, shank thickness and the fundamental shape are fixed. Resizing within a range, swapping a stone before setting, altering the finish and adding engraving all remain possible.

How long does a custom ring take to make?

Around a week of bench time for a typical piece, plus one to three days for CAD and however long approval takes. On an international order, transit and customs are frequently longer than the making β€” which is why production time and transit time should always be quoted separately.

What causes most delays on a custom order?

Waiting for CAD approval, and revision cycles caused by a vague brief. Giving numbers at the start β€” millimetres, karat, thickness β€” and responding promptly at the approval stage removes most of it. A late or converted ring size is the other common cause, since it can mean a resize after delivery.

Take a day over the CAD.

Ask us for the side elevation and the numbers. It is the only stage where changes are free.

Browse the collection

Keep reading

Leave a comment